G745-2024

Change Directive for a Design-Build Project

$49.99

One-time use

Quantity

AIA Document G745™–2024 is a directive for changes in the Work for use where the owner and design-builder have not reached an agreement on proposed changes in the contract sum or contract time. AIA Document G745–2024 was developed as a directive for changes in the work which, if not expeditiously implemented, might delay the project. Upon receipt of a completed G745–2024, the design-builder must promptly proceed with the change in the work described therein, unless the design-builder determines the applicable building codes or other regulatory requirements, including those related to health, safety, and welfare, preclude implementation of the change.

When to use this document?

  • Any size project
  • Any payment method

Related Documents

The G745-2024 works best with these coordinated documents – use them together for the best results


Standard Form of Agreement Between Owner and Design-Builder for a Traditional Design-Build Project

$149.99

Standard Form of Agreement Between Owner and Design-Builder for a Progressive Design-Build Project

$149.99

Standard Form of Agreement Between Design-Builder and Architect for a Traditional Design-Build Project

$149.99

Standard Form of Agreement Between Design-Builder and Architect for a Progressive Design-Build Project

$149.99

Standard Form of Agreement Between Design-Builder and Subcontractor for a Design-Build Project

$149.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

Construction Change Orders vs. Construction Change Directives: Key Differences Explained

Clarifies the distinctions between construction change directives and change orders, including their applications and implications.

3 Key Factors that Impact Change Order Pricing

Identifies three critical factors influencing the pricing of change orders in construction projects.