G711-2018

Architect’s Field Report

$49.99

One-time use

Quantity

The architect’s project representative can use this standard form to maintain a concise record of periodic site visits or, in the case of a full-time project representative, a daily log of construction activities. Observations, including known deviations from the Contract Documents and from the most recent construction schedule submitted by the Contractor, as well as defects and deficiencies observed in the Work, align with the Architect’s reporting obligations to the Owner specified in the B101™-2017 Owner-Architect Agreement. Pursuant to that Agreement, the Architect is not required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work.

When to use this document?

  • Any size project
  • Maintains a record of site visits or daily log of construction activities

Related Documents

The G711-2018 works best with these coordinated documents – use them together for the best results


Standard Form of Agreement Between Owner and Architect

$149.99

Change Order

$49.99

Shop Drawing and Sample Record

$49.99

Construction Change Directive

$49.99

Request for Information (RFI)

$49.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

Predesign services: Prepare for success with AIA Contract Documents

Discusses the role of predesign services in achieving successful project outcomes using AIA contract documents.

What Are Differing Site Conditions (DSC) in Construction Contracts?

Explains the concept of differing site conditions and their impact on construction contracts.