Endorsed by:

A481-2025

Standard Form of Agreement Between Construction Manager and Modular Subcontractor, Volumetric Modular Construction Edition

$149.99

One-time use

Quantity

AIA Document A481™–2025 outlines the contractual relationship, responsibilities, and obligations between the Construction Manager and Modular Subcontractor on projects where the Owner utilizes the volumetric modular construction delivery method and where the Construction Manager provides a guaranteed maximum price for labor and materials. It includes coordinated pre-design and preconstruction services between the project participants for the designs of the Modules and of the Project, construction phase services, compensation methods, and specifies the use of insurance and bond requirements.

When to use this document?

  • Modular project
  • Various compensation methods

Related Documents

The A481-2025 works best with these coordinated documents – use them together for the best results


General Conditions of the Contract for Construction, Volumetric Modular Construction Edition

$149.99

Application and Certificate for Payment Contractor-Subcontractor Variation

$49.99

Continuation Sheet Contractor-Subcontractor Variation

$49.99

Generic Conditional Waiver and Release on Progress Payment

$49.99

Generic Unconditional Waiver and Release on Progress Payment

$49.99

Generic Conditional Waiver and Release on Final Payment

$49.99

Generic Unconditional Waiver and Release on Final Payment

$49.99

Generic Sworn Construction Statement

$49.99

Contractor's Affidavit of Payment

$49.99

Contractor’s Affidavit of Release of Liens

$49.99

Request for Information (RFI)

$49.99

Proposal Request

$49.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.