A441-2014

Standard Form of Agreement Between Contractor and Subcontractor for a Design-Build Project

$149.99

One-time use

Quantity

AIA Document A441™–2014 establishes the contractual relationship between the contractor and subcontractor in a design-build project. AIA Document A441–2014 incorporates by reference the terms and conditions of AIA Document A142™–2014, Standard Form of Agreement Between Design-Builder and Contractor, and was written to ensure consistency with the AIA 2014 Design-Build family of Document. Because subcontractors are often required to provide professional services on a design-build project, A441–2014 provides for that possibility.

When to use this document?

  • Any size project
  • Design-build project

Related Documents

The A441-2014 works best with these coordinated documents – use them together for the best results


Standard Form of Agreement Between Design-Builder and Contractor

$149.99

Application and Certificate for Payment for a Design-Build Project Subcontractor Variation

$49.99

Continuation Sheet for a Design-Build Project Subcontractor Variation

$49.99

Generic Conditional Waiver and Release on Progress Payment

$49.99

Generic Unconditional Waiver and Release on Progress Payment

$49.99

Generic Conditional Waiver and Release on Final Payment

$49.99

Generic Unconditional Waiver and Release on Final Payment

$49.99

Generic Sworn Construction Statement

$49.99

Change Order Contractor-Subcontractor Variation

$49.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

How the Construction Manager Delivery Method Differs from the Traditional Design-Bid-Build Approach

Compares the Construction Manager delivery method with the traditional Design-Bid-Build approach, outlining key differences and considerations.

Design-Build vs Design-Bid-Build: Key Differences, Benefits, and Contract Frameworks

Compares design-build and design-bid-build project delivery methods, highlighting key differences and implications for stakeholders.

The Progressive Design-Build Delivery Method

Highlights recent advancements in sustainable construction practices and technologies as of 2024, offering insights into emerging trends and regulatory updates.