AIA Document A281™–2025 outlines the roles and relationships between the Owner, Construction Manager, Architect, and Modular Subcontractor in projects that utilize the volumetric modular construction delivery method and where the Construction Manager provides a guaranteed maximum price for labor and materials.

When to use this document?

  • Modular project
  • Cost of the Work Plus a Fee with a Guaranteed Maximum Price

Related Documents

The A281-2025 works best with these coordinated documents – use them together for the best results


Standard Form of Agreement Between Owner and Construction Manager as Constructor, Volumetric Modular Construction Edition

$149.99

Standard Form of Agreement Between Construction Manager and Modular Subcontractor, Volumetric Modular Construction Edition

$149.99

Application for Payment for a COW Project with a GMP

$49.99

Continuation Sheet for Cost of the Work Projects

$49.99

Generic Conditional Waiver and Release on Progress Payment

$49.99

Generic Unconditional Waiver and Release on Progress Payment

$49.99

Generic Conditional Waiver and Release on Final Payment

$49.99

Generic Unconditional Waiver and Release on Final Payment

$49.99

Generic Sworn Construction Statement

$49.99

Contractor's Affidavit of Payment

$49.99

Contractor’s Affidavit of Release of Liens

$49.99

Consent of Surety to Final Payment

$49.99

Consent of Surety to Reduction in or Partial Release of Retainage

$49.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.