The general conditions are an integral part of the contract for construction for a large project, and they are incorporated by reference into the owner/contractor agreement. They set forth the rights, responsibilities, and relationships of the owner, contractor, and architect. Though not a party to the contract for construction between owner and contractor, the architect participates in the preparation of the contract documents and performs construction phase duties and responsibilities described in detail in the general conditions. AIA Document A201™–2017 is adopted by reference in owner/architect, owner/contractor, and contractor/subcontractor agreements in the Conventional Design-Bid-Build (A201) family of documents; thus, it is often called the “keystone” document.

When to use this document?

  • "Umbrella" document for a design-bid-build project
  • Various design-bid-build agreements refer to and incorporate by reference

Related Documents

The A201-2017 works best with these coordinated documents – use them together for the best results


Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

$149.99

Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

$149.99

Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

$149.99

Standard Form of Agreement Between Contractor and Subcontractor

$149.99

Change Order

$49.99

Application and Certificate for Payment

$49.99

Generic Conditional Waiver and Release on Progress Payment

$49.99

Generic Unconditional Waiver and Release on Progress Payment

$49.99

Generic Conditional Waiver and Release on Final Payment

$49.99

Generic Unconditional Waiver and Release on Final Payment

$49.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

What is a Schedule of Values and Why is it Required on Construction Projects?

Explains the purpose and importance of a schedule of values in construction projects, detailing how it facilitates progress payments and financial tracking.

AIA Document A201: A Contractor-s Guide to the General Conditions

Provides an overview of AIA Document A201, explaining its general conditions and their application for contractors.

The Crucial Role of A201-2017, General Conditions in Construction Contracts

Discusses the significance of A201-2017 in establishing clear terms, balancing risk, and promoting collaboration in construction projects.