A134-2019

Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guarantee Maximum Price

$149.99

One-time use

Quantity

Similar to AIA Document A133™–2019, AIA Document A134™–2019 is intended for use where a construction manager, in addition to serving as Advisor to the owner during the preconstruction phase, also provides construction of the project. However, in AIA Document A134–2019 the construction manager does not provide a guaranteed maximum price (GMP). A134–2019 employs the cost-plus-a-fee method, wherein the owner can monitor cost through periodic review of a control estimate that is revised as the project proceeds.

The document divides the construction manager’s services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. A134-2019 is drafted to be used in conjunction with a new Insurance and Bonds Exhibit (Exhibit A) which is a critical part of the agreement and should be discussed with legal and insurance counsel.

A134–2019 is coordinated for use with AIA Documents A201®–2017, General Conditions of the Contract for Construction, and B133™–2019, Standard Form of Agreement Between Owner and Architect, Construction Manager as Constructor Edition.

When to use this document?

  • Large project
  • Where construction manager is the constructor
  • Cost plus without guaranteed maximum price (GMP)
  • Adopts A201, General Conditions

Related Documents

The A134-2019 works best with these coordinated documents – use them together for the best results


General Conditions of the Contract for Construction

$149.99

Sustainable Projects Exhibit Construction Manager as Constructor

$149.99

Application for Payment for a COW Project without a GMP

$49.99

Continuation Sheet for Cost of the Work Projects

$49.99

Change Order

$49.99

Construction Change Directive

$49.99

Certificate of Substantial Completion

$49.99

Authorization to Proceed with Early Release Work

$49.99

Generic Conditional Waiver and Release on Progress Payment

$49.99

Generic Unconditional Waiver and Release on Progress Payment

$49.99

Generic Conditional Waiver and Release on Final Payment

$49.99

Generic Unconditional Waiver and Release on Final Payment

$49.99

Generic Sworn Construction Statement

$49.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

How the Construction Manager Delivery Method Differs from the Traditional Design-Bid-Build Approach

Compares the Construction Manager delivery method with the traditional Design-Bid-Build approach, outlining key differences and considerations.

Increase pre-construction collaboration with updated Construction Manager documents

Highlights updates to construction manager documents aimed at enhancing pre-construction collaboration.

Streamlining Construction Processes: AIA Contract Documents in the Construction Manager as Constructor Delivery Method

This article examines how AIA Contract Documents facilitate the Construction Manager as Constructor (CMc) delivery method, focusing on improving efficiency and collaboration in construction projects.