A132-2019
Standard Form of Agreement Between Owner and Contractor Construction Manager as Advisor Edition
$149.99
One-time use
Quantity
AIA Document A132™–2019 is a standard form of agreement between owner and contractor for use on projects where the basis of payment is either a stipulated sum (fixed price) or cost of the work plus a fee, with or without a guaranteed maximum price. In addition to the contractor and the architect, a construction manager assists the owner in an advisory capacity during design and construction. Typically, there will be more than one prime contractor on these types of projects.
The document has been prepared for use with AIA Documents A232™–2019, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; B132™–2019, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition; and C132™–2019, Standard Form of Agreement Between Owner and Construction Manager as Adviser. This integrated set of documents is appropriate for use on projects where the construction manager only serves in the capacity of an adviser to the owner, rather than as constructor (the latter relationship being represented in AIA Documents A133™–2019 and A134™–2019).
When to use this document?
- Large project; Where construction manager is the Advisor
Related Documents
The A132-2019 works best with these coordinated documents – use them together for the best results
General Conditions of the Contract for Construction Construction Manager as Advisor Edition
$149.99
Sustainable Projects Exhibit construction Manager as Advisor Edition
$149.99
Application and Certificate for Payment Construction Manager as Advisor Edition
$49.99
Continuation Sheet
$49.99
Change Order, Construction Manager as Advisor Edition
$49.99
Construction Change Directive, Construction Manager as Advisor Edition
$49.99
Certificate of Substantial Completion, Construction Manager as Advisor Edition
$49.99
Generic Conditional Waiver and Release on Progress Payment
$49.99
Generic Unconditional Waiver and Release on Progress Payment
$49.99
Generic Conditional Waiver and Release on Final Payment
$49.99
Generic Unconditional Waiver and Release on Final Payment
$49.99
Generic Sworn Construction Statement
$49.99
Request for Evidence of Owner’s Financial Arrangements
$49.99