G741: Change Order for Design-Build Projects
Frequently Bought Together:
$59.99
One-Time Use
Quantity
What Our Clients Are Saying

Tom Donaghy, Principal
KGD Architecture
“Our clients are familiar with AIA Contract Documents and respect the fact that we use them. That common ground provides the momentum that fuels both sides throughout the project.”

Christy Blumefield, President
Blume Architecture
“AIA Contract Documents have been a constant in the journey of my firm. They’re dependable, reliable, and provide a measure of credibility that’s unmatched.”

Tom Donaghy, Principal
KGD Architecture
“Our clients are familiar with AIA Contract Documents and respect the fact that we use them. That common ground provides the momentum that fuels both sides throughout the project.”
Related Documents
The G741: Change Order for Design-Build Projects works best with these coordinated documents – use them together for the best results






