C404-2021

Standard Form of Agreement Between Contractor and Consultant for Delegated Design Services

$149.99

One-time use

Quantity

AIA Document C404™-2021 is a standard form agreement where a contractor can hire a consultant to perform delegated design services on a project. The terms “contractor” and “consultant” are intentionally flexible, as numerous parties in a project could hire someone, or be hired, to perform delegated design services. The “contractor” could be a general contractor, construction manager, or subcontractor, whereas the “consultant” should be a design professional who is properly licensed to perform the design services described in the C404-2021 agreement.

Delegated design describes a form of design collaboration where the contractor assumes responsibility for an element or portion of a project’s design. Delegated design is commonly used for the design of retaining walls, trusses, mechanical systems, fire suppression systems, curtain walls, and many other building components. Given this, C404-2021 is a flexible agreement that allows the parties to define the portion of the design that will be performed by the consultant.

When to use this document?

  • Can be used as a stand-alone agreement
  • Can be used as a complimentary document to many owner/contractor or owner/construction manager agreements.

Related Documents

The C404-2021 works best with these coordinated documents – use them together for the best results


Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

$149.99

Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

$149.99

Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price

$149.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

If You-re Performing Preconstruction Services, Be Sure to Set Performance and Payment Expectations Before the Work Begins

Emphasizes the importance of defining performance and payment terms before starting preconstruction services to mitigate risks and ensure clear expectations.

Examine the New Design Assist and Delegated Design Services Agreement

Examines the new Design Assist and Delegated Design Services Agreement, outlining roles and responsibilities in collaborative projects.

Increase Design Collaboration with Design Assist & Delegated Design Services Agreements in Construction

Clarifies 'Design Assist' and 'Delegated Design' roles in construction, highlighting AIA's C403-2021 agreement for defining scopes and responsibilities.