C198-2010

Standard Form of Agreement Between Single Purpose Entity and Consultant for Integrated Project Delivery

$149.99

One-time use

Quantity

AIA Document C198™–2010 is a standard form of agreement between a single purpose entity (“the SPE”) and a consultant. AIA Document C198–2010 is intended for use on a project where the parties have formed the SPE utilizing AIA Document C195™–2008, Standard Form Single Purpose Entity Agreement for Integrated Project Delivery. C198–2010 is coordinated with C195–2008 in order to implement the principles of integrated project delivery. The specific services the consultant is required to perform are set forth within the document as well as the Integrated Scope of Services Matrix, which is part of the C195–2008 Target Cost Amendment. In addition to traditional compensation for services, C198–2010 allows for the consultant to receive additional profit through incentive compensation and goal achievement compensation.

When to use this document?

  • Large project
  • Agreement between the limited liability company (LLC) and consultant

Related Documents

The C198-2010 works best with these coordinated documents – use them together for the best results


Standard Form of Agreement Between Single Purpose Entity and Owner for Integrated Project Delivery

$149.99

Standard Form of Agreement Between Single Purpose Entity and Non-Owner Member for Integrated Project Delivery

$149.99

Standard Form Single Purpose Entity Agreement for Integrated Project Delivery

$149.99

Standard Form of Agreement Between Single Purpose Entity and Contractor for Integrated Project Delivery

$149.99

BIM Exhibit for Sharing Models with Project Participants Where Model Versions May be Enumerated as a Contract Document

$149.99

BIM Exhibit for Sharing Models with Project Participants Where Model Versions May Not be Enumerated as a Contract Document

$149.99

BIM Exhibit for Sharing Models with Project Participants on a Design-Build Project

$149.99

BIM Exhibit for Sharing Models Solely Within the Design Team

$149.99

BIM Exhibit for Sharing Models Solely Within the Construction Team

$149.99

Sustainable Projects Exhibit

$149.99

Architects’ Scope and Responsibility Matrix

$149.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

Five Things you Should Know About Integrated Project Delivery Contracts

Highlights five key aspects of Integrated Project Delivery (IPD) contracts, focusing on collaboration and risk-sharing mechanisms.

What is Integrated Project Delivery (IPD)? A Comprehensive Guide to IPD Contracts

Provides a comprehensive guide to Integrated Project Delivery contracts, detailing collaborative approaches and shared responsibilities.