C172-2014

Standard Form of Agreement Between Owner and Program Manager for use on a Single Project

$149.99

One-time use

Quantity

AIA Document C172™–2014 is a standard form agreement between owner and program manager for use on a single project. The program manager assists the owner in an advisory capacity on matters that impact the project during design and construction. The program manager’s basic services include creating a program management plan to describe the scope of the project and related requirements, managing project-related information, developing a budget and schedule, and establishing quality control guidelines. C172-2014 also contains cost estimating and construction administration services that the parties may select as additional services. Unlike in the Construction Manager as Advisor family of Document, where the construction manager has some shared responsibilities with the architect, in C172 the program manager does not have shared responsibilities with other project participants or authority to act directly on behalf of the owner with respect to the responsibilities of the architect or contractor. C172–2014 is primarily intended to be used with the Conventional Design-Bid-Build (A201) family of documents.

When to use this document?

  • Medium-sized project
  • Single-project program

Related Documents

The C172-2014 works best with these coordinated documents – use them together for the best results


BIM Exhibit for Sharing Models with Project Participants Where Model Versions May Not be Enumerated as a Contract Document

$149.99

Standard Form of Architect’s Services: Site Evaluation and Project Feasibility

$149.99

Sustainable Projects Exhibit

$149.99

Standard Form of Architect’s Services: Master Planning

$149.99

Standard Form of Architect’s Services: Furniture Furnishings and Equipment (FF&E) Design Services

$149.99

Standard Form of Architect’s Services: Purchasing Agent Services for Furniture Furnishings and Equipment (FF&E)

$149.99

Purchase Order

$149.99

Invitation and Instructions to Vendors for Quotations for Furniture Furnishings and Equipment (FF&E)

$149.99

Standard Form of Architect’s Services: Facility Support

$149.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

Practical considerations for effective program management

Offers practical advice for achieving effective program management in construction projects.

Building Stronger Construction Project Teams: A Guide to Collaboration and Teamwork

Offers guidance on fostering collaboration and teamwork to strengthen construction project teams.