C132-2009 KDE

Kentucky Version - Standard Form of Agreement Between Owner and Construction

$49.99

One-time use

Quantity

The KDE versions of the AIA Document include KDE mandated amendments to the standard text of the AIA Document and will be used for school construction projects administered by the District Facilities Branch of the Kentucky Department of Education.    AIA Document C132™–2009 provides the agreement between the owner and the construction manager, a single entity who is separate and independent from the architect and the contractor, and who acts solely as an Advisor (CMa) to the owner throughout the course of the project. AIA Document C132–2009 is coordinated for use with AIA Document B132™–2009, Standard Form of Agreement Between Owner and Architect, Construction Manager as Advisor Edition. Both C132–2009 and B132–2009 are based on the premise that there will be a separate construction contractor or multiple prime contractor's whose contract(s) with the owner will be jointly administered by the architect and the construction manager under AIA Document A232™–2009. AIA Document C132–2009 is not coordinated with, and should not be used with, Document where the construction manager acts as the constructor for the project, such as in AIA Document A133™–2009 or A134™–2009.

When to use this document?

  • Only for Kentucky Department of Education (KDE) project
  • Large project
  • Where construction manager is the Advisor
  • Adopts A232, General Conditions

Related Documents

The C132-2009 KDE works best with these coordinated documents – use them together for the best results


Kentucky Version - Standard Form of Agreement Between Owner and Architect, Construction Manager as Advisor Edition

$49.99

Kentucky Version - Instructions to Bidders

$49.99

Application and Certificate for Payment

$49.99

Continuation Sheet

$49.99

Generic Conditional Waiver and Release on Progress Payment

$49.99

Generic Unconditional Waiver and Release on Progress Payment

$49.99

Generic Conditional Waiver and Release on Final Payment

$49.99

Generic Unconditional Waiver and Release on Final Payment

$49.99

Generic Sworn Construction Statement

$49.99

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.


Related Articles

C132-2019 vs. C132-2009

Analyzes differences between C132-2019 and C132-2009 agreements, focusing on owner and construction manager as adviser roles.

Construction Manager as Advisor vs. Constructor: Understanding Project Delivery Methods

Compares the roles and responsibilities of Construction Manager as Adviser (CMa) and as Constructor (CMc).

Increase pre-construction collaboration with updated Construction Manager documents

Highlights updates to construction manager documents aimed at enhancing pre-construction collaboration.